Print This Story  Email This Story  Save this Link View PR Newswire's RSS Feed  Blogs Discussing this News Release  Search Blogs that Mention this News Release  Click this link to view linked Bookmarking Services Click this link to view linked Blogging Services


PennDOT to Switch on Traffic Signals on $2,045,556.60 Montour Interchange Ramps Construction

    Pennsylvania Department of Transportation District Engineer Henry M.
Nutbrown will be joined for the ceremony Thursday, April 2, at 11:30 a.m., by
State and local officials, including Senator Jack Wagner (42nd District) and
Representative John R. Pippy (44th District).
    The project reconstructed the entire Montour Interchange Ramps including
construction of a Concrete Slab Wall, Single Face Concrete Barrier, Curbs,
Guide Rails, Fill Benches, Traffic Signals, Signing, Highway Lighting and
Pavement Markings.
    All within a length of 2,122.05 linear feet.
    Michael Facchiano Contracting, Incorporated was the contractor.

    CONTACT:  Constance Parker of PennDOT, 412-429-5011.


SOURCE PennDOT




Back to Topback to top

  • http://www.prnewswire.com or fax, 800-758-5804, ext. 682850
    Related links:
  • http://www.ppt.psu.edu